Concrete arches
Design and architecture

Design practices that see how their buildings actually perform.

Architects, MEP engineers and sustainability consultants specify a measurement layer, then compare the model with measured use system by system. Post occupancy evaluation runs on data, not a survey.

Device health
ERS-CO2 · Level 2, Zone 4
Connection reliability99.2%
Battery3.61 V
Last reading1 min ago
Demo data
How does this week compare to the last few weeks?
12% below last week, driven by lower HVAC load on weekday afternoons. Two days had low meter coverage.
Demo data
Problems by outcome

What design and architecture teams are up against.

Water, energy, air and operations carry equal weight. Each one runs the same loop: monitor, measure, identify, act, verify.

01

Water: Domestic water and towers

Leaks and tower make-up counted as demand

02

Energy: Central plant at part load

Rated efficiency in the model, fouled coils in the building

03

Air: Ventilation

Design airflow delivered to half empty zones

04

Operations: Schedules and setpoints

Commissioning settings nobody checks against the model

Problem, solution, impact

Problem, solution, impact.

How Aqueduct resolves each problem for design and architecture, and what changes when it does.

The problemHow Aqueduct solves itThe impact
Water

Leaks and tower make-up counted as demand

A live water balance across meters and sub-meters localizes the loss, routes the fix and confirms it closed at the meter.

Loss found from the balance, not the bill, and every fix verified.

Energy

Rated efficiency in the model, fouled coils in the building

Weather-normalized baselines per building and asset show the waste in money; schedules and setpoints adjust where control is enabled.

Savings stated in money and confirmed at the meter, not estimated.

Air

Design airflow delivered to half empty zones

Air quality per zone, overlaid with occupancy, with ventilation raised when it matters and verified back in range.

Targets held during occupied hours, with the energy cost counted.

Operations

Commissioning settings nobody checks against the model

Faults diagnosed in plain language and routed into your CMMS with the fix; early signs of failure schedule maintenance first.

Fewer reactive call-outs and closures confirmed by the equipment.

One incident, start to finish

One incident, from first signal to verified fix.

An illustrative example of the flywheel on a typical site.

Monitor

Meter schedule specified at design, mapped to model zones.

Measure

Commissioned with the BMS. First season baseline.

Identify

East wing heating well above the model.

Act

Traced to overlapping deadbands, sent to FM.

Verify

Fixed in aftercare. Assumption corrected for the next model.

Connected products

Four connected products on one data layer.

aQ WaterGuard

Find every leak and loss, fix it, prove it. Powered by aQ Core.

Learn more

aQ EnergySmart

Cut waste and peak demand, feeder by feeder. Powered by aQ Core.

Learn more

aQ AirSafe

Hit air targets without burning energy. Powered by aQ Core.

Learn more

aQ PredictIQ

Faults fixed, failures prevented. Powered by aQ Core.

Learn more
Replace or integrate

Replace what should be replaced. Connect the rest.

Replaces or works with your
  • Occupant surveys as the only POE
  • Design-stage rating used as the only evidence
  • Ad hoc data requests to owners
Integrates with your
  • BMS through BACnet and Modbus
  • Energy model outputs for comparison
  • Owner and FM reporting

Three equal ways in: keep your BMS, replace it, or build Aqueduct in at design stage.

Who it is for

The questions each seat asks first.

Design or practice principal
“Can we prove our buildings perform, not just certify?”
MEP or building services engineer
“Which of my modeling assumptions were wrong, and by how much?”
Sustainability consultant
“Can post occupancy evaluation carry measured data instead of a survey?”
Standards and regulations

Standards and regulations we supply evidence for.

We supply the measured inputs. You run the program and file the report.

ASHRAE 90.1 and ENERGY STAR benchmarking (US)NECB 2020 (Canada)MEES and ESOS (UK)Al Sa'fat and Estidama Pearl (Middle East)ECBC (India)NABERS (Australia)
Rules and standards

A metering specification that survives procurement.

LineWhat to specifyWhat it tests later
Main incomersRevenue grade, over Modbus or BACnetWhole building use for benchmarking
HVAC plantChillers, heat pumps or boilers, pumps, major AHUsLocates a gap to the plant
Lighting and small powerBoards per floor or tenancyTests plug load assumptions
WaterCooling make-up, irrigation, kitchens, risersCloses a water balance
By the numbers

Rules that make metering a design decision.

5

electrical categories ASHRAE 90.1 requires new buildings to monitor separately.

Source: ASHRAE
15 June 2022

date England began requiring a means of monitoring indoor air in new offices.

Source: UK Approved Document F
29 May 2026

deadline for EU states to transpose the recast EPBD.

Source: European Commission
Where this is going

From certified design to measured outcome.

1
Now

The points already exist

Practices that map code required meters to model zones get post occupancy comparison with no extra hardware.

2
2031

Ratings in operation

UK lets over 1,000 square meters move to EPC B, and owners will ask design teams to show performance.

Proof

Proven in live sites across sectors.

Anonymized results from live sites.

Deployed
275+

sites in 21 countries run on Aqueduct.

Healthcare
22 hospitals

and 9 clinics in one of India’s top hospital chains.

Airports
A top 25

US airport running water intelligence on Aqueduct.

Real estate
20M+ sq ft

of commercial real estate under Aqueduct.

Customer names withheld. Every result is anonymized.
Questions

Common questions

No. Any model that predicts use at system level can be compared with metered data, and the comparison sharpens as months of operating data come in. Gaps between design intent and actual use show up per system rather than as one building total.

Yes, as far as the owner allows. Data rights are agreed in the specification, so measured energy and water results can support case studies, award entries or post-occupancy reports with the owner's consent.

At design stage, alongside the MEP engineers, so meters, sensors and BMS points are planned once instead of retrofitted. See build it in for how Aqueduct is specified into new construction.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.