Use case: peak demand and tariffs

How to reduce peak demand charges and power factor penalties

A demand charge is set by the highest interval of the billing period, often a few minutes when chillers, kitchens and process loads start together. Aqueduct tracks kW against your target as it builds, shows which feeder drives it, and staggers loads before the peak lands.

Powered by aQ EnergySmart and Smart Controls
Electrical cabinet with tagged breakers
Peak demand today
612 kW
Contracted 650 kWChillers sequenced
Demo data
Energy balance · active power
412Grid+146Solar=338HVAC+99Light+16Loss
Power factor 0.96Carbon today 1.9 t
Demo data

One busy quarter hour can set the price of a whole month.

The mechanism

How a peak gets set

  • Coincident starts

    Refrigeration, HVAC and process loads start in the same window after a shutdown or at opening time.

  • Invisible until the invoice

    The peak is recorded by the utility meter and reported weeks later, after nothing can be done.

  • Poor power factor

    When current and voltage drift out of phase, apparent power rises and the site pays for capacity it does not use.

Breakers and wiring in a panel
The numbers

Why demand deserves its own watch

5 million

US commercial customers were eligible for tariffs with demand charges above $15 per kW.

Source: NREL and Clean Energy Group, 2017
10,000+

utility tariffs were reviewed to reach that figure.

Source: NREL and Clean Energy Group, 2017
About 4%

a year growth in global electricity demand is forecast to 2027, tightening peak capacity.

Source: IEA Electricity 2025
How it is solved

Staying under the band

01

Set the target

Contracted demand and tariff bands go into rate configuration, so every interval is judged against what it costs.

02

Watch the build

Facility kW and kVA are tracked live on the electrical digital twin, feeder by feeder.

03

Sequence the loads

Starts are staggered and non-critical loads delayed in a set priority order, where control is enabled, with owner approval. Critical loads are never shed.

04

Correct power factor

Feeders with poor power factor or high loading against rated kVA are flagged for correction.

What to measure

Demand metrics worth a daily look

MetricWhat it tells youAct when
Peak interval demand against targetHow close the month is to a new bandIt passes your warning threshold.
Peak driver by feederWhich load sets the peakOne feeder repeats as the driver.
Power factor per feederReactive penalty exposureIt falls below your tariff threshold.
Loading against rated kVAInfrastructure headroomA feeder runs near its rating.
Trusted at scale
Read the case studies
Deployed275+

sites in 21 countries run on Aqueduct.

Healthcare22 hospitals

and 9 clinics in one of India’s top hospital chains.

AirportsA top 25

US airport running water intelligence on Aqueduct.

Real estate20M+ sq ft

of commercial real estate under Aqueduct.

Manufacturing300 acres

FMCG manufacturing campus.

Food and dairyMajor dairy

operations run on Aqueduct.

Questions

Common questions

No. Load sequencing works on its own. Where batteries, solar or backup generation exist, they appear on the electrical twin and can be scheduled against the peak. See peak demand management.

Interval data from the main meter at minimum. Sub-meters on major feeders show which load drives the peak, and the bills supply the tariff so each avoided kW is priced. See electricity meters.

As peak interval demand against target for each billing period, with each sequencing action recorded in command history. Finance can match the result to the demand line on the invoice. See for CFOs and finance teams.

Aqueduct shows power factor per feeder and where the reactive penalty comes from, so correction equipment goes where it pays. Your electrical contractor fits it; Aqueduct then measures the change. See power factor.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.