Construction

Construction projects that meter the build and hand over a building with evidence.

During the build, temporary power, generators and site water are metered per feed and package. At handover, a commissioned measurement layer gives the owner a baseline instead of a design promise.

Device health
ERS-CO2 · Level 2, Zone 4
Connection reliability99.2%
Battery3.61 V
Last reading1 min ago
Demo data
How does this week compare to the last few weeks?
12% below last week, driven by lower HVAC load on weekday afternoons. Two days had low meter coverage.
Demo data
Problems by outcome

What construction teams are up against.

Water, energy, air and operations carry equal weight. Each one runs the same loop: monitor, measure, identify, act, verify.

01

Water: Site water

Dust suppression, concrete and welfare on one standpipe

02

Energy: Diesel generators

Sets idling through nights and weekends at low load

03

Air: Boundary dust

Breaches found by complaint, not by the record

04

Operations: Handover

Meters commissioned late, so operation starts with no baseline

Problem, solution, impact

Problem, solution, impact.

How Aqueduct resolves each problem for construction, and what changes when it does.

The problemHow Aqueduct solves itThe impact
Water

Dust suppression, concrete and welfare on one standpipe

A live water balance across meters and sub-meters localizes the loss, routes the fix and confirms it closed at the meter.

Loss found from the balance, not the bill, and every fix verified.

Energy

Sets idling through nights and weekends at low load

Weather-normalized baselines per building and asset show the waste in money; schedules and setpoints adjust where control is enabled.

Savings stated in money and confirmed at the meter, not estimated.

Air

Breaches found by complaint, not by the record

Air quality per zone, overlaid with occupancy, with ventilation raised when it matters and verified back in range.

Targets held during occupied hours, with the energy cost counted.

Operations

Meters commissioned late, so operation starts with no baseline

Faults diagnosed in plain language and routed into your CMMS with the fix; early signs of failure schedule maintenance first.

Fewer reactive call-outs and closures confirmed by the equipment.

One incident, start to finish

One incident, from first signal to verified fix.

An illustrative example of the flywheel on a typical site.

Monitor

Temporary supplies, generators and site water metered per feed.

Measure

A baseline per package and period.

Identify

Generator 3 idling through the weekend.

Act

Alert to the site manager with a smaller set option.

Verify

Weekend running stopped. Fuel saving booked to the package.

Connected products

Four connected products on one data layer.

aQ WaterGuard

Find every leak and loss, fix it, prove it. Powered by aQ Core.

Learn more

aQ EnergySmart

Cut waste and peak demand, feeder by feeder. Powered by aQ Core.

Learn more

aQ AirSafe

Hit air targets without burning energy. Powered by aQ Core.

Learn more

aQ PredictIQ

Faults fixed, failures prevented. Powered by aQ Core.

Learn more
Replace or integrate

Replace what should be replaced. Connect the rest.

Replaces or works with your
  • Manual generator logs
  • Periodic dust surveys
  • Retrofitted metering after handover
Integrates with your
  • BMS through BACnet and Modbus
  • Project and cost reporting exports
  • Owner CMMS at handover

Three equal ways in: keep your BMS, replace it, or build Aqueduct in at design stage.

Who it is for

The questions each seat asks first.

Project director
“Can we report site energy, water and carbon per project, not per company?”
Developer or owner
“Will the building hold the rating it was sold on once it is occupied?”
MEP lead
“Does specifying this constrain the BMS or controls procurement?”
Standards and regulations

Standards and regulations we supply evidence for.

We supply the measured inputs. You run the program and file the report.

ASHRAE 90.1 and ENERGY STAR benchmarking (US)NECB 2020 and national benchmarking (Canada)MEES, ESOS and SECR (UK)Al Sa'fat and Estidama Pearl (Middle East)ECBC and BRSR Core (India)NABERS and NCC Section J (Australia)
By the numbers

Why the handover record matters.

32%

of global energy use comes from buildings and construction.

Source: UNEP, 2025
5

electrical categories ASHRAE 90.1 section 8.4.3.1 requires new buildings to monitor.

Source: ASHRAE
2031

year larger UK commercial lets need EPC B, where cost effective.

Source: RICS, July 2026
Rules and standards

What the finished building is judged on.

Rule or standardDateWhat it asks for
ASHRAE 90.1 section 8.4.3Since the 2013 editionSeparate monitoring of HVAC, lighting and receptacle loads
England Approved Document FFrom 15 June 2022A means of monitoring indoor air quality in new offices
EU EPBD recastTransposed by 29 May 2026Higher performance for new and renovated buildings
Where this is going

Ratings follow the building into operation.

1
May 2026

EPBD in national law

New buildings across the EU will increasingly be judged on what they use, not what they were modeled to use.

2
2031

Lettability tied to EPC B

A building handed over without system meters makes the improvement case harder to prove.

Proof

Proven in live sites across sectors.

Anonymized results from live sites.

Deployed
275+

sites in 21 countries run on Aqueduct.

Healthcare
22 hospitals

and 9 clinics in one of India’s top hospital chains.

Airports
A top 25

US airport running water intelligence on Aqueduct.

Real estate
20M+ sq ft

of commercial real estate under Aqueduct.

Customer names withheld. Every result is anonymized.
Questions

Common questions

Yes. Clip-on CT sensors, pulse counters and gateways go in without cutting into permanent systems, come out at demobilization and are redeployed on the next site, so the same monitoring kit serves project after project.

The building owner. Access for the contractor and the design team continues as agreed in the contract, so commissioning and defects-period data stay available to the people who need them after handover.

The first months of operation set the baseline an owner is judged against. Metering from commissioning onward shows whether systems run as designed, and the same data carries into operation when Aqueduct is built in from the start.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.