Automated production line
Manufacturing units

Plants where utilities are measured per line, and faults are fixed before they stop one.

Compressed air, steam, process water and motors stop a line or quietly double its cost. Aqueduct meters them per line and asset, flags drift before a stop, and routes the fix into your CMMS.

AHU-1 · fault
Supply fan stopped08:02
Failed rotor shaft08:03
Routed to CMMS08:04
Airflow confirmed11:40
Demo data
Compressor 2 · condition
7.1 mm/s vibration
Maintenance scheduled before failure
Demo data
Problems by outcome

What manufacturing units teams are up against.

Water, energy, air and operations carry equal weight. Each one runs the same loop: monitor, measure, identify, act, verify.

01

Water: Process water and cooling towers

Blowdown and passing valves hidden in the intake total

02

Energy: Compressed air network

Leaks loading compressors through weekends and shift changes

03

Air: Steam distribution

Failed traps sending live steam to the condensate return

04

Operations: Critical rotating equipment

Bearing wear unseen until a motor trips

Problem, solution, impact

Problem, solution, impact.

How Aqueduct resolves each problem for manufacturing units, and what changes when it does.

The problemHow Aqueduct solves itThe impact
Water

Blowdown and passing valves hidden in the intake total

A live water balance across meters and sub-meters localizes the loss, routes the fix and confirms it closed at the meter.

Loss found from the balance, not the bill, and every fix verified.

Energy

Leaks loading compressors through weekends and shift changes

Weather-normalized baselines per building and asset show the waste in money; schedules and setpoints adjust where control is enabled.

Savings stated in money and confirmed at the meter, not estimated.

Air

Failed traps sending live steam to the condensate return

Air quality per zone, overlaid with occupancy, with ventilation raised when it matters and verified back in range.

Targets held during occupied hours, with the energy cost counted.

Operations

Bearing wear unseen until a motor trips

Faults diagnosed in plain language and routed into your CMMS with the fix; early signs of failure schedule maintenance first.

Fewer reactive call-outs and closures confirmed by the equipment.

One incident, start to finish

One incident, from first signal to verified fix.

An illustrative example of the flywheel on a typical site.

Monitor

Compressors, boilers, pumps and feeders read, SCADA read only.

Measure

A baseline per line, shift and asset.

Identify

Compressor 2 loaded on a Sunday with production stopped.

Act

Leak survey ticket with the flow profile.

Verify

Weekend load back to baseline. Saving priced.

Connected products

Four connected products on one data layer.

aQ WaterGuard

Find every leak and loss, fix it, prove it. Powered by aQ Core.

Learn more

aQ EnergySmart

Cut waste and peak demand, feeder by feeder. Powered by aQ Core.

Learn more

aQ AirSafe

Hit air targets without burning energy. Powered by aQ Core.

Learn more

aQ PredictIQ

Faults fixed, failures prevented. Powered by aQ Core.

Learn more
Replace or integrate

Replace what should be replaced. Connect the rest.

Replaces or works with your
  • Utility monitoring
  • EMS
  • Leak and balance tools
  • Plant air quality monitoring
Integrates with your
  • CMMS and EAM
  • SCADA and historians, read only
  • ERP for cost allocation

Three equal ways in: keep your BMS, replace it, or build Aqueduct in at design stage.

Who it is for

The questions each seat asks first.

Plant manager
“Will it prevent an unplanned stop?”
Maintenance manager
“Does it work with our CMMS?”
EHS lead
“Can I show the real exposure curve?”
Standards and regulations

Standards and regulations we supply evidence for.

We supply the measured inputs. You run the program and file the report.

Manufacturing in depth

Guides for FMCG and process plants

FMCG campuses

Water, power, steam and air measured per business unit, ranked by use per tonne or litre.

Learn more

Compressed air and steam

Leak load, specific power, failed steam traps and condensate return, priced per month.

Learn more

Process water and utilities

A live process water balance to ZLD, with power factor and maximum demand per feeder.

Learn more
By the numbers

What utility failures cost a plant.

20 to 30%

of a compressor’s output can leak away; proactive repair gets it under 10%.

Source: Compressed Air Challenge
15 to 30%

of steam traps may fail in systems left unmaintained for 3 to 5 years.

Source: US DOE Steam Tip Sheet
$1.4 trillion

lost each year to unplanned downtime by the 500 largest companies.

Source: Siemens, 2024
Where this is going

Stops are getting longer, and teams are responding.

1
2024

Recovery takes longer

Siemens found average recovery from a stop rose from 49 to 81 minutes, and almost half of manufacturers now run a predictive maintenance team.

2
Every week

Leaks found from the weekend baseline

Compressor load with production stopped is the leak load, measured without a survey.

Proof

Proven in live sites across sectors.

Anonymized results from live sites.

Deployed
275+

sites in 21 countries run on Aqueduct.

Healthcare
22 hospitals

and 9 clinics in one of India’s top hospital chains.

Airports
A top 25

US airport running water intelligence on Aqueduct.

Real estate
20M+ sq ft

of commercial real estate under Aqueduct.

Customer names withheld. Every result is anonymized.
Questions

Common questions

No. Aqueduct reads SCADA, PLC and historian data read only, and production control stays with your systems. Utility equipment such as exhaust fans can be scheduled through separate relays or field devices only with owner approval, and every command is logged.

Yes. Aqueduct meters water, power, steam and compressed air per line and divides them by the output your plant shares, so each product carries its measured utility cost. Monthly allocations export to your ERP. See sub-metering by production line.

Often, yes. aQ PredictIQ reads vibration, temperature and power on rotating equipment, flags drift from each asset's own normal well before a trip, and schedules the work in your CMMS. Lead time depends on the failure mode and the sensors fitted. See predictive maintenance.

With the utility that costs the most and is measured least, usually compressed air, steam or process water. Aqueduct meters that system first, sets a baseline per line and prices each finding, then extends the same model to the next utility and the next plant. See compressed air and steam.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.