Colorado River cuts in 2027: what Arizona businesses should measure now

From 2027, federal guidelines cut Lower Basin Colorado River deliveries by 1.25 million acre-feet a year for two years, with Arizona taking 760,000 acre-feet under the states' sharing plan. City officials say taps will keep running, so the risk for a commercial site is cost and conservation rules. The work now is knowing which systems on each site use the water.
What Interior decided
On 21 August 2026 the Interior Department issued operating guidelines for 2027 and 2028 that reduce deliveries to the Lower Basin by 1.25 million acre-feet in each year. If the states carry out their proposed sharing agreement, Arizona takes 760,000 acre-feet, California 440,000 and Nevada 50,000. The Lower Basin states are also to conserve and store at least 700,000 acre-feet over the two years.
NPR reported the cuts start on 1 January and amount to 27 percent of Arizona's Colorado River supply each year through 2028. The Central Arizona Project, which holds junior rights, is hit hardest. The guidelines cover only 2027 and 2028 and sit inside a 10 year framework that runs to 2036.
How exposed each city is
| City | Colorado River share of supply | What officials said |
|---|---|---|
| Phoenix | About 40 percent, with the Salt and Verde rivers supplying about 58 percent | A water resources adviser said the cuts will not threaten deliveries to homes, and that customers will pay the bill. |
| Mesa | More than half | The mayor called it not an emergency; the city expects its supply to drop 20 percent. |
| Gilbert | About 41 percent | Loses 20 percent of its allocation. NPR reports bills have roughly doubled since 2024. |
| Cave Creek | About 95 percent | A consultant put alternatives five to eight years away. |
Why cost arrives before shortage
The Arizona Water Bank agreed to give utilities access to all of the water they lose to the cutbacks, but only for one year. After that, cities replace the water from sources that cost more. Phoenix's mayor said new supplies may not be as cost effective, and Phoenix is building a purification plant at Cave Creek that NPR says could send water into city pipes as soon as early 2029.
For a business, that points to higher water and sewer rates and tighter conservation rules from the city, not a dry tap. A site that knows where its water goes can show which increase came from the rate and which came from its own use.
Where a commercial site's water goes, and what to meter
| Use | Why it matters in the desert | What to meter |
|---|---|---|
| Cooling towers | Evaporation and blowdown rise with heat load, and summer is long. | Makeup and blowdown, each on its own meter. |
| Outdoor irrigation | Timers run through monsoon rain and overnight leaks go unseen. | The irrigation feed, read daily, against rainfall. |
| Restrooms and domestic water | Flush valves and fixtures run whether or not floors are occupied. | Washroom lines against the occupancy schedule. |
| Kitchens and process lines | Dishwashers, wash-down and clean in place cycles draw in bursts. | Each process line split from domestic water. |
| Night and weekend flow | Leaks and stuck valves show up when the building should be still. | Main meter flow in the early morning hours. |
How Aqueduct sets a baseline before the cut
aQ WaterGuard draws each site as a water balance: main supply equals the metered floors, fire system and process feeds plus unaccounted loss. A rising unaccounted term points to a leak or an unmetered use rather than to the weather.
Uploading 6 to 12 months of utility bills gives each site an expected baseline on day one, set by regression on its own use and cooling degree days at its location. The rate configuration from those bills turns the gap into dollars, and bill analytics separate a cost change caused by a rate increase from one caused by higher use.
Four steps before January
- Confirm the provider and its mixCheck which city or private utility serves each site and how much of its supply comes from the Colorado River.
- Load the billsCollect 12 months of water and sewer bills per site so the baseline and rates are set before the first 2027 bill.
- Meter the big threePut meters on cooling tower makeup, irrigation and the main line's night flow first. They decide most of the result.
- Review tower cycles with the treatment vendorAgree a target for cycles of concentration and track it monthly from the makeup and blowdown readings.
Where this is going
The 2027 to 2028 cut is a floor for planning, not a ceiling. Interior's framework allows Lower Basin shortages of up to 3.0 million acre-feet and is revisited every two years, so the next set of guidelines will be written in 2028.
Arizona still has to settle how its share is split among individual users through the Central Arizona Project's priority rules. Sites that hold a year of line-level data by then will be able to show their city what they already saved.
Sources
| Source | Link |
|---|---|
| US Department of the Interior, Interior Department finalizes plans for 2027 to 2028 Colorado River operations (21 August 2026) | doi.gov |
| US Department of the Interior, Reclamation publishes Final EIS on future Colorado River operations (31 July 2026) | doi.gov |
| Bureau of Reclamation, Post-2026 decision documents | usbr.gov |
| NPR via WNYC, Arizona's taps won't run dry, but water bills will go up (31 August 2026) | wnyc.org |
| KJZZ, Arizona cities brace for big cuts to water supply (7 August 2026) | kjzz.org |
| KAWC, Arizona to see Colorado River water reduced by 760,000 acre-feet (25 August 2026) | kawc.org |


