Ways in: replace your BMS

Replace a BMS that has aged out, one function at a time.

Aqueduct can take over BMS, BAS and EMS functions by controlling equipment directly: LoRaWAN relay switches for simple loads, and Modbus or BACnet through a field device network controller for air handlers, rooftop units, chillers and VAV boxes. The scope is confirmed site by site.

Large industrial fans on a plant wall
Command history · RTU-2
Occupied mode07:00 · executed
Economizer on07:12 · executed
Lockout active07:13 · held
Demo data
Compressor 2 · condition
7.1 mm/s vibration
Maintenance scheduled before failure
Demo data
The problem

Signs the BMS has aged out.

01

Unsupported controllers

Parts and programming tools are no longer available.

02

Frozen sequences

Nobody on staff can change a schedule without a service call.

03

No metering

It runs equipment but cannot say what water or energy the building used.

04

Ignored alarms

Hundreds of nuisance alarms, so real faults go unread.

Function by function

What Aqueduct takes over.

BMS functionIn Aqueduct
SchedulesSite schedules per device, with the command sent, next and last execution, and status.
Sequences and automationsA rule builder with thresholds, occupancy triggers and if/else logic.
Equipment groupsControl clusters that operate and analyze devices and sensors as one system.
Equipment protectionLockouts that block new commands while one is still being acted on, preventing short cycling.
AuditCommand history showing whether each command executed.
How it runs

A replacement in four stages.

01

Survey

List equipment, protocols and which functions to move.

02

Monitor first

Aqueduct reads the equipment while the old system still controls it.

03

Move functions

Schedules, then automations, then the rest, one system at a time and only with owner approval.

04

Verify

Setpoint attainment, comfort compliance and command history confirm each move.

By the numbers

Why replacement is on the agenda.

16%

of the worst-performing non-residential buildings in the EU must be renovated by 2030 under the recast EPBD.

Source: European Commission
$268

per metric ton of CO2e over the limit is the NYC Local Law 97 penalty, with limits tightening in 2030.

Source: NYC Department of Buildings
Questions

Common questions

Yes. Aqueduct takes over functions one at a time, and anything not moved keeps running on the old system. Many sites move schedules first, then sequences, and leave the rest until controllers reach end of support. See keeping your BMS.

Aqueduct can do a BMS job for the equipment it controls: schedules, sequences, equipment groups and protection. It also adds what a BMS usually lacks, such as water and energy metering, weather-normalized baselines and fault diagnosis. Read about BMS, BAS and EMS.

Aqueduct blocks a new command while an earlier one is still being acted on, which prevents short cycling, and records whether each command executed. Commands run only on equipment the owner has approved for control. See trust and security.

Aqueduct switches simple loads such as exhaust fans and lighting circuits with LoRaWAN relay switches. Air handlers, rooftop units, chiller plants and VAV boxes are controlled over BACnet or Modbus through a field device network controller. See controllers and actuators.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.