What is CGWA NOC?
A CGWA NOC is the no objection certificate India's Central Ground Water Authority issues before an industrial, infrastructure or mining project may extract groundwater, with conditions on metering and reporting.
Who needs one
Per the Ministry of Jal Shakti, CGWA regulates groundwater withdrawal in 19 States and UTs, issuing NOCs for industrial, infrastructure, mining and other uses under its Guidelines dated 24.09.2020. In the remaining States and UTs, State Ground Water Authorities issue permissions under their own rules, so the issuing body depends on where the site sits.
Conditions that carry numbers
The Ministry's March 2026 reply to the Rajya Sabha lists the main safeguards in the 2020 guidelines.
- Installing water flow meters, maintaining them and submitting extraction data is a mandatory NOC condition; CGWA promotes meters with telemetry
- Industries extracting more than 100 KLD must have a water audit done every two years by certified water auditors
- No new industries may extract groundwater in over-exploited areas, other than MSMEs
- Extraction charges follow slabs, higher in over-exploited, critical and semi-critical areas
- Extraction without a valid NOC, or beyond the approved quantity, draws Environmental Compensation
Abstraction records per borewell
Aqueduct ingests telemetry from smart flow meters on each borewell or source and totals daily extraction against the quantity in the NOC, so drift toward the limit is visible weeks before a compliance return. For a 100 KLD plant, line-level data on process, cooling, RO and STP gives the water auditor attributable use rather than one inlet number.