GRAP, Delhi NCR

GRAP in Delhi NCR: what the 2026 schedule asks of facilities

GRAP is the Commission for Air Quality Management's staged response plan for Delhi NCR, triggered as the Air Quality Index worsens. The schedule revised on 28 September 2026 moved diesel generator set actions from Stage II to Stage I, and Stage I took effect across NCR on 21 October. Sites need a daily record of when generators ran and what their indoor air looked like.

Powered by aQ AirSafe and aQ EnergySmart, built on aQ Core
Ceiling air unit under a glass roof
Hall B · occupied
1,184 ppm CO₂
Ventilation adjusted
Demo data
Site air health · 24h
Unhealthy, driven by CO₂
Over 2000 ppm for 20+ minutes within an occupied hour. Increase ventilation, raise outdoor air supply or check the AHU economizer.
3 of 4 zones breaching · outdoor 67°F
Demo data

Who it applies to

GRAP actions run across the National Capital Region, including Delhi, Gurugram, Faridabad, Ghaziabad and Gautam Budh Nagar, and the 2026 revision adds Sonipat to the vehicle restrictions. Agencies enforce it against sites, and CAQM reported closure orders for more than 1,800 violating units.

Construction and demolition sites of 500 square meters or more register on state pollution control board portals and install cameras. From 2026 that monitoring also covers large sites outside municipal limits, including industrial areas and highway corridors, which brings many campus and plant expansions into scope.

The 2026 schedule

What changed, and the data behind it

Summaries from the sources below. Check the current CAQM order for exact wording and exemptions before acting.

ChangeWhat it means for a siteData Aqueduct supplies
Diesel generator set actions moved from Stage II to Stage IGenerator limits now apply from the first stage, in effect since 21 October.An energy balance with grid, solar and diesel generator as separate sources, so run hours and kWh from the generator are logged each day.
48 actions across four stages: 25 in Stage I, 8 in Stage II, 10 in Stage III, 5 in Stage IVMore is asked earlier in the season, while the later stages stay short.A dated record per site that lines up with each stage's start and end.
Dust monitoring extended beyond municipal limitsLarge construction outside city limits now registers and is watched by camera.Not measured by Aqueduct. The record sits on the state portal.
Stricter vehicle entry rules in Stages III and IVDeliveries and fleet movements can stop at short notice.Not measured by Aqueduct. Plan logistics against the stage.
By the numbers

The season so far

244

Delhi AQI at 2 pm on 21 October 2026, up from 179 a day earlier, when Stage I was invoked.

Source: India TV
25

First-stage measures in the revised plan, the largest of the four.

Source: News On AIR
400

Peak reading that triggered last season's top stage, on 17 January.

Source: News On AIR

Indoor air when the outdoor index is poor

A poor outdoor index puts building operators in a bind. More outdoor air dilutes CO2 indoors but brings in particulates, and less outdoor air keeps particulates out while CO2 builds in occupied rooms. Neither choice is right for every zone at every hour.

Aqueduct shows CO2 and particulates per zone, overlaid with occupancy, so the team sees which rooms are full and stale and which can run on lower outdoor air. CO2 exposure is tracked in zone-hours, because a high level held for an afternoon matters more than a short spike.

Where this is going

Each revision has moved actions earlier. In 2026 the generator set measures moved from Stage II to Stage I, and dust monitoring left city limits, so a site now meets more rules on the first poor day of the season, not the worst.

The January 2026 Stage IV order shows how far a season can run. Sites that log generator use and indoor air every day can answer an inspector from data rather than from a logbook filled in afterward.

Trusted at scale
Read the case studies
Deployed300+

sites in 21 countries run on Aqueduct.

Healthcare22 hospitals

and 9 clinics in one of India’s top hospital chains.

AirportsA top 25

US airport running water intelligence on Aqueduct.

Real estate20M+ sq ft

of commercial real estate under Aqueduct.

Manufacturing300 acres

FMCG manufacturing campus.

Food and dairyMajor dairy

operations run on Aqueduct.

Questions

Common questions

GRAP is the Graded Response Action Plan, a four-stage list of pollution measures that the Commission for Air Quality Management switches on as Delhi's Air Quality Index worsens. Aqueduct keeps the site records that line up with each stage. See indoor air quality compliance.

Yes. Since the late September 2026 revision, generator measures sit in the first stage, which CAQM invoked across NCR on 21 October, rather than waiting for Stage II. Exemptions are set in each CAQM order. Aqueduct records generator output as its own source line. See the digital twin.

From a meter on the generator feed, read on the same clock as grid and solar. Aqueduct draws the site's energy balance with each source as its own node, so daily run hours and kWh from the generator are recorded and exportable for an inspection. More on energy outcomes.

Not across the board. Cutting outdoor air keeps particulates out but lets CO2 build in full rooms, so the right setting differs by zone and hour. Aqueduct shows CO2 and particulates per zone with occupancy, so teams adjust where the trade-off favors it. See particulate monitoring.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.