NYC cooling tower rules

NYC cooling tower Legionella rules: what changed in 2026

Since 8 May 2026, New York City requires Legionella testing of every operating cooling tower each month instead of every 90 days, and a tower counts as operating whenever water is in it, even in winter. Aqueduct supplies the run, flow and conductivity record that shows when testing and emergency sampling were due.

Powered by aQ Assure and aQ WaterGuard
Water meter on yellow pipework
Water balance · live
42.6Supply=36.1Floors+4.2RO+2.3Loss
Unaccounted loss rising on line CW-4
Demo data
Bill validation · September
Supplier billed184.2 MWh
Metered176.9 MWh
Difference7.3 MWh
Demo data

Who it applies to

Every owner of a cooling tower system in New York City, under section 17-194.1 of the Administrative Code and Chapter 8 of Title 24 of the city's rules. The 2026 amendments wrote Local Law 159 of 2025 into the rules and took effect on 8 May 2026.

The rule defines operation broadly. A tower is in operation whenever water is present in the system, whether or not it is rejecting heat, so a seasonal tower left filled through winter stays on the testing clock.

Chapter 8 as amended

What changed on 8 May 2026, and the data behind it

Summarized from the Health Department's notice of adoption. Check the rule text and the department's guidance before relying on it.

RequirementWhat the rule says nowData Aqueduct supplies
Legionella culture testingNo more than 31 days between samples, during operation.A start and stop record per tower, built from water level and flow.
Who analyzes samplesA laboratory accredited under New York State ELAP, reported with a signed chain of custody.Not measured by Aqueduct.
Reporting to the citySample dates within 5 days of testing, and results at Level 4 or above within 24 hours.Sample dates stamped against the run log.
Weekly bacteriological indicatorA heterotrophic plate count or dip slide each week the tower operates. Plate counts go to an ELAP lab.Not measured by Aqueduct. Results can be imported next to process readings.
Maintenance program and planThe preparer certifies it every year, and it now includes a valve schedule.The operating configurations and sensor points the plan describes, kept current.
Emergency sampling triggersPower failure, loss of biocide treatment, or conductivity controls failing to hold cycles of concentration.Power, conductivity, and makeup and blowdown flow, with alerts when a reading leaves its range.

Why the emergency triggers are the hard part

Monthly sampling is a calendar task. The emergency triggers are not. An overnight power cut, a biocide pump that stops, or a controller that lets cycles of concentration drift each call for extra sampling, and none of them appears on a weekly checklist.

Aqueduct reads the signals behind those triggers: supply power to the tower, conductivity, and makeup and blowdown flow from the meters in place. When a reading drifts, the alert names the tower and the time, so the water treatment contractor can decide on emergency sampling that day. Chapter 8 allows continuous and automated measurement, provided the plan shows how it is monitored.

By the numbers

Timing and penalties

31 days

Longest gap allowed between Legionella samples while a tower operates.

Source: NYC Health, notice of adoption, Chapter 8
24 hours

To report Legionella results at Level 4 or above to the Health Department.

Source: NYC Health, notice of adoption, Chapter 8
$1,000 to $2,000

Penalty for weekly routine monitoring not done, up from $500 to $1,000.

Source: NYC Health, notice of adoption, Chapter 8

Where this is going

The Health Department said it will publish written guidance and hold question and answer sessions on the amended rule. The amendments also added penalties for failing to report operation, startup and shutdown dates, so the operating calendar is now enforced in its own right.

Winter is the first test. A tower left filled and idle from November to April is still in operation under the definition, so owners either keep sampling monthly or drain it and report the shutdown.

Trusted at scale
Read the case studies
Deployed300+

sites in 21 countries run on Aqueduct.

Healthcare22 hospitals

and 9 clinics in one of India’s top hospital chains.

AirportsA top 25

US airport running water intelligence on Aqueduct.

Scale80M+ sq ft

of buildings, campuses and networks under Aqueduct.

Manufacturing300 acres

FMCG manufacturing campus.

Food and dairyMajor dairy

operations run on Aqueduct.

Questions

Common questions

Every month the tower runs. Local Law 159 of 2025 replaced the 90 day interval on 8 May 2026, and the city wants each sample date reported within 5 days. Aqueduct sets the next due date from the tower's own start and stop dates rather than the calendar. For the wider program, see ASHRAE 188.

Yes, if water is still in it. Chapter 8 counts a filled tower as operating even with no heat load, so owners keep sampling or drain it and report the shutdown date. Aqueduct flags towers that hold water with no flow for days, which is the idle but filled case. More on water balance.

Yes, when it lasts long enough for bacteria to grow. A biocide outage, drifting conductivity control or a Health Department request also count. Aqueduct timestamps each outage per tower, which gives the treatment contractor the duration to judge against. See fault detection.

No. Samples still go to a New York State ELAP accredited lab, and chemical treatment stays with the contractor. Aqueduct holds the plant side readings the lab never sees, so a high result can be checked against what the tower was doing that week. Browse the compliance library for related rules.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.